Packaging Machinery

An obsolete drive found before the rebuild bill landed

A packaging operation faced a full control system rebuild when an obsolete inverter failed. Rowlec sourced a genuine unit worldwide and kept the line in production.

What changed

Retrofit avoided

Line restored on its original control platform, upgrade planned into a shutdown

Genuine unit

Correct drive revision located through worldwide sourcing

Held in stock

A second drive now carried on the customer's behalf

We keep our customers anonymous, so sites are described by sector and region rather than by name. Every figure and outcome on this page is as reported to us by the customer, not measured independently by Rowlec.

The full story

What happened
and what we did.

The site
Shrink wrapper at the end of a high volume packing line
Where it started
A fifteen year old inverter, out of production and unsupported
What was at stake
A full control retrofit, or hand wrapping every pallet
01

The challenge

A shrink wrapper at the end of a high volume line stopped when its AC inverter dropped out. The drive was more than fifteen years old, long out of production, and the original machine builder no longer supported the platform. The obvious route was a full control retrofit: new drive, new motor, new wiring, a fresh programme and commissioning time the site did not have. Two of the customer's usual suppliers came back with nothing. Every day the wrapper sat idle, finished pallets were being hand wrapped and the despatch bay was falling behind.

02

Our approach

Rowlec took the rating plate details and the machine wiring schedule, confirmed the exact frame size, control card and firmware revision, then worked its worldwide sourcing network rather than a single catalogue. That meant obsolete stock specialists, surplus holders and manufacturer refurbishment channels across Europe and beyond. A genuine unit of the correct revision was located, tested and shipped, with the parameter set checked against the original configuration before it left. Rowlec also priced a planned retrofit for the same asset, so the customer had a considered upgrade path rather than an emergency one.

03

The outcome

The wrapper was back in production on the original control platform, with no rewiring, no reprogramming and no commissioning window to negotiate around the production plan. The customer avoided the cost and disruption of an unplanned retrofit and kept the decision on their own terms, scheduling the upgrade into a shutdown later in the year. A second unit of the same drive was added to the critical spares held on their behalf, so the next failure on that asset is a planned swap rather than a search. Sourcing enquiries for hard-to-find parts now come to Rowlec first.

Everyone else told us to rip the panel out and start again. Rowlec found the actual drive, and we were wrapping pallets again that week.
Maintenance Manager, contract packing operation, Yorkshire

Sound like your site?

Tell us where the downtime actually comes from. We will look at it honestly and tell you what we would change.

Arrange a site visit

Rapid. Reliable. Responsive.

Emergency deliveries and around-the-clock support for our SLA customers.

Learn more

KEEPING INDUSTRY MOVING

Ask Rowlec.

AI assistant

What can we help you keep moving? Ask about products, sourcing or managed stores.

Finding an answer…

Messages are processed by our AI service provider to generate replies. Please leave out personal or confidential details. AI can make mistakes.